“We found the Method Architect’s team very helpful at all stages of the project, and certainly instrumental in successfully getting us through this period of significant change. We found them to be very flexible and supportive in the face of some very tight deadlines that we found ourselves against, and they readily came up with innovative solutions to help us. We would have no hesitation in recommending Method Architects for similar projects of this nature.” Alan Northern, General Manager, June 2019
Method Architects recently worked on the refurbishment of a successful Holiday Inn Express – IHG’s fastest growing hotel brand. The Holiday Inn Express in Burton-upon-Trent was upgraded to IHG brand standard Gen IV in a fast-track fit-out that required an architectural service that was nimble, quick and comprehensive: tight deadlines meant a quick turnaround for information.
The hotel remained in continual operation during the works which were phased to accommodate the refurbishment of the 82 bedrooms over 4 floors, as well as the upgrading of the public spaces. Method Architects worked closely with the hotel’s General Manager to accommodate the hotel’s requirements within the timescales and with IHG design to carry out a sucessful re-modelling of the areas.
The project revitalised the hotel’s public spaces: reception, lounge and dining area Great Room with adaptations to the ceilings and walls of meeting room and kitchen, new reception area, conversion of office to luggage room, public WCs.
Our work involved space planning, design alterations to the existing layout, furniture layouts, assistance with the Hotel’s procurement of furniture and lighting, re-design of the reception to accommodate new Gen IV furniture, and the upgrade of all guest bedrooms in accordance with the Design Guide: new lighting, wall and floor coverings, case goods, bathrooms, window dressings, hotel corridors.
The project was completed in summer 2019.